9/9/2014

Detached, safe and approved – from building to residence

The ground meter cabinet is positioned in the ground within the plot and works all the way from construction to finished home.

Manufactured, tested and approved according to the Swedish Standard SS 430 01 10, edition 9.

The meter cabinet completely replaces the traditional, façade mounted, meter cabinet. They are used during the construction period, which can save travelling time, eliminate unnecessary waiting time and above all, a transition from construction period to permanent connection without interruption. A 5-pin socket and a Schuko socket can be connected to optional portable distribution panels during the construction period and the property owner can easily connect a car heater socket or charging pole for electric vehicles directly from the ground meter cabinet.

The ground meter cabinet is manufactured, tested and approved according to the Swedish Standard SS 430 01 10, edition 9.

Read more.  Download Garo's Ground Meter Cabinet product sheet.